The saga of the CL Lindy at the Port of Astoria continues, as the ship, which is waiting to unload six wind turbine blades onto a barge before heading upriver, now moves to the Astoria Anchorage to make way for a cruise ship calling on the port today.

After that ship leaves, the Lindy will move back to the dock, and with (we hope!) her malfunctioning cranes repaired she may be ablel to start the process of cargo transfer.

(For the back story on why this ship is here at the Port, see yesterday’s podcast…)